Our company, together with Promalp Group, carried out work to replace 56 double-glazed windows on the 25th floor. Work was also carried out to refine and partially replace the Reynaers CW50 facade system. Having carried out this work, we increased the energy efficiency of the structure by 3 times. Multifunctional glass was installed in the double-glazed windows, which significantly reduced the heating of the room in the summer.
More information about the work performed in the section facades from the Reynaers profile